Highlights
• Reach Resources (ASX: RR1) has completed all 163 holes of the grade control program at the NW Pit, Murchison South Gold Project, confirming and in several areas exceeding the existing geological model.
• Final results include 9m at 4.7g/t gold from 6m (including 2m at 18.5g/t gold) and 15m at 1.9g/t gold from 8m, with 13 holes across the full program returning intervals above 5g/t gold.
• Five consecutive holes on a single grade control line all intersected significant mineralisation from at or near surface, providing confidence in the ore-waste boundary definition needed for mining.
• The completed dataset will now be used by Andel Resources and SMS Mining to finalise short-term mine scheduling for the NW Pit, with mining scheduled for 2027.
Reach Resources Limited (ASX:RR1), an ASX-listed gold explorer and developer focused on the Murchison South Gold Project near Paynes Find in Western Australia, has announced the completion of its 163-hole grade control drilling program at the proposed NW Pit. The final batch of 40 holes has returned further high-grade results, adding to those reported in October 2026 and validating — and in several areas exceeding — the existing geological and resource model. The completed dataset will now feed directly into short-term mine scheduling ahead of proposed first ore production.
Final Hole Results and Overall Program Outcomes
The best of the final 40 holes included hole 26MSGC0127, which returned 9m at 4.7g/t gold from 6m, including 2m at 18.5g/t gold — a higher grade than the geological model had predicted for that area. Hole 26MSGC0120 returned 15m at 1.9g/t gold from 8m, intersecting a zone previously modelled as low grade, while hole 26MSGC0126 returned 10m at 1.9g/t gold from surface, including 1m at 12.4g/t gold. Five consecutive holes on a single grade control section line (26MSGC0125 to 26MSGC0129) all intersected significant mineralisation from at or near surface — a result that provides strong confidence in the grade continuity and ore-waste boundary definition needed for bench-by-bench mining.
Across the full 163-hole program, 13 holes returned intervals above 5g/t gold and five topped 10g/t gold, with the peak result being 2m at 24.6g/t gold reported in October. The closer-spaced 10m x 10m grid has revealed a nuggety quartz-vein-hosted style of mineralisation with local zones of higher grade and greater width than the resource model, which is consistent with the nature of this type of gold deposit and expected when tightening drill spacing from the resource grid to grade control.
Mining Operations and Next Steps
The grade control program was completed to inform mining by Andel Resources Pty Ltd's Subsidiary SMS Mining, under the binding Right to Mine Agreement announced in August 2026. Andel's GM of Geology and Resource Strategy noted that the complete grade control dataset gives a sound basis to set ore-waste boundaries bench by bench and manage dilution through mining. Reach Resources confirmed it continues to work with Andel to plan similar grade control works at the Central and South pits ahead of mining in 2027. The company is also progressing its Mining Proposal submission, targeted for November.
Exploration Upside
Beyond the grade control program, Reach Resources has highlighted that mining leases M59/790, 786 and 799 — which contain strike extensions of the Primrose Shear and historical gold workings — remain undrilled by the company, representing exploration upside beyond the current 80,000-ounce Mineral Resource at the Blue Heaven deposit. Additionally, results from the approximately 2,000m resource step-out program conducted in September 2026 are still awaited. The company also holds a strategic shareholding in Delta Lithium Limited and an Investment in REEcycle Inc.
Key Insights
The validation and in-places exceedance of the resource model by the grade control program is a positive outcome, as it suggests the actual mined ore content could meet or exceed resource model expectations.
Five consecutive holes intersecting mineralisation from surface on a single section line is a particularly strong result for mine planning, reducing uncertainty about ore-waste boundaries in that portion of the pit.
The nuggety, quartz-vein-hosted style of mineralisation is typical of Archean greenstone gold deposits and justifies the tight 10m x 10m grid as the appropriate approach for pre-mining definition.
With the Mining Proposal submission targeted for November 2026 and mining scheduled for 2027, Reach Resources is on a defined path to production at Murchison South.
_11_12_2026_10_36_35_483404.jpg)


_11_12_2026_10_36_50_897036.jpg)


Please wait processing your request...