Key Highlights
- SPRD-21 intersected 102m at 1.0% Cu and 5.1g/t Ag from 706m, including 72m at 1.24% Cu and 6.8g/t Ag
- SPRD-18 returned 68m at 1.13% Cu and 8.7g/t Ag including 22m at 2.07% Cu and 10.0g/t Ag
- SPRD-24 hit multiple high-grade stacked mantos including 8m at 3.21% Cu and 27.5g/t Ag
- Drilling at 150m spacing confirms continuity of mineralisation across the central high-grade zone
Marimaca Copper Corp. (TSX:MARI, ASX:MC2) has reported further assay results from its ongoing drilling program at the Pampa Medina deposit, located approximately 28 km east of the company's Marimaca Oxide Deposit in Chile's Antofagasta Region. Drilling completed on 150-metre centres within the central zone continues to demonstrate continuity of the mineralised mantos within the target sedimentary horizons.
Central Zone Drill Results
The headline result from the latest batch is SPRD-21, which intersected 102m at 1.00% Cu and 5.1g/t Ag from 706m downhole, including 72m at 1.24% Cu and 6.8g/t Ag from 710m. The hole demonstrates the continuity of thick, stacked mantos at Pampa Medina, with drilling intersecting mineralisation into the basement units.
Approximately 150m to the north, SPRD-18 intersected 68m at 1.13% Cu and 8.7g/t Ag from 634m, including 22m at 2.07% Cu and 10.0g/t Ag from 668m. SPRD-18 also encountered near-surface oxide mineralisation of 68m at 0.36% Cu from 142m, extending the known oxide footprint by approximately 150m to the west.
Additional results include SPRD-19 with 34m at 1.36% Cu and 6.6g/t Ag from 832m, SPRD-25 with 54m at 1.12% Cu from 320m, and SPRD-24 which hit multiple high-grade stacked mantos including 8m at 3.21% Cu and 27.5g/t Ag from 454m.
Extension and Step-Out Drilling
The drilling program within the central high-grade zone is nearing completion, with drill rigs moving to test continuity to the north at Pampa Norte and to the west at Sierra Norte. Additional extension drilling within the defined 3 km by 1.5 km area of interest remains ongoing, with broader step-out holes planned to target the northern extension of the deposit. SPR-37 extended an ultra-high-grade manto 300m east of previous drilling, while SPRD-26 intersected near-surface oxide mineralisation 300m west of the historical oxide footprint.
The results reinforce the continuity and grade of mineralisation across the central portion of Pampa Medina and expand the known footprint of both sulphide and oxide mineralisation beyond previously drilled areas.






Please wait processing your request...