Highlights

  • Drilling at Orient North intersected multiple broad vein systems over more than 70 metres total thickness, 450 metres north of the Orient East resource area.
  • Mineralisation confirmed over 900 metres along strike from the Orient West Mineral Resource Estimate, with the majority of that strike corridor untested.
  • Vein 1 delivered the thickest intercept to date in one drill hole, with the structure now intersected across a strike extent of at least 750 metres.
  • An updated Mineral Resource Estimate incorporating the new data is expected in the fourth quarter of 2026, feeding into a Scoping Study due in early 2027.

Iltani Resources Limited (ASX:ILT), the Queensland-focused explorer advancing what it describes as Australia's largest and highest-grade known silver zinc indium project, has released assay results from the final 21 reverse circulation drill holes completed as part of its Orient Resource Infill and Extension drilling program. Announced on 25 November 2026, the results encompass holes targeting several zones across the broader Orient system, including Orient North, the Orient West NE Extension, and Vein 1. While the company acknowledged that individual results from this Tranche are less spectacular than those previously released from Orient East, it characterised them as more strategically meaningful, given their implications for the total footprint and future scale of the mineralised system.

Orient North and Extension Zone Results

The most geologically significant results from this release came from Orient North, where drill hole ORR230 — located approximately 450 metres north of the Orient East resource boundary and approximately 950 metres northeast of Orient West — intersected multiple zones of silver-lead-zinc-indium mineralisation at comparatively shallow depths. The hole encountered broad vein systems over more than 70 metres of total thickness, with high-grade cores intersected at several depth intervals from surface to beyond 250 metres. The geometry of Orient North mineralisation is interpreted to be similar to Orient East, trending east-west and dipping to the north, and was targeted using surface mapping and airborne geophysical data. At the Orient West NE Extension, drilling continued the systematic push along strike, with holes confirming mineralisation at 250 to 350 metres from the edge of the Orient West resource. Notably, three further drill holes were completed at the far end of the extension zone, more than 900 metres along strike from the resource boundary, returning mineralisation at multiple intervals.

Vein 1 — Thickest Intercept to Date

The Vein 1 structure, which runs subparallel to the main Orient vein systems, delivered results that management described as highly encouraging. Drill hole ORR242 intersected a 14-metre zone of mineralisation at depth, the thickest result ever recorded at Vein 1, including a high-grade core. This was notably wider than previously observed intercepts in the structure, confirming that Vein 1 has the potential to deliver higher-tonnage mineralisation than its thickness in earlier holes suggested. Including results from this program, Vein 1 has now been intersected in thirteen separate drill holes over a strike extent of at least 750 metres and to a depth of around 160 metres below surface. The structure remains open in both strike directions and at depth, suggesting that the full scale of Vein 1 is yet to be defined. Two additional holes also intersected a previously unknown shallow vein system in the hanging wall of Vein 1, adding a further target for future follow-up.

Next Steps: Resource Update and Scoping Study

The 110-hole Orient Resource Infill and Extension drilling program is now complete. The data generated will be used to update the existing Orient Mineral Resource Estimate, with the update expected in the fourth quarter of 2026. The updated resource will provide greater confidence and improved classification, forming the basis for an Orient Project Scoping Study expected to be completed in early 2027. In the near term, Iltani is commencing a further ten-hole program targeting the Link Zone — the corridor between Orient West and Orient East — and selected up-dip portions of Orient East and Vein 1. This work is designed to finalise plans for a larger 2027 drilling campaign once updated resource estimates are available. The existing Orient Mineral Resource currently stands at over 62 million tonnes at meaningful equivalent silver grades, with contained indium and silver the key economic drivers alongside zinc and lead.

Key Insights

The Orient system continues to demonstrate potential for meaningful resource growth well beyond the current mineralised footprint. The confirmation of mineralisation 900 metres along strike from the Orient West resource, combined with the depth and thickness of Orient North and the expanding Vein 1 structure, underscores the system's scale. The upcoming resource update and Scoping Study will be critical milestones for investors seeking to understand the economic potential of what management describes as Australia's most significant silver zinc indium project.