Highlights
- Cufe launched a 20,100-metre RC and diamond drilling programme across the Tennant Creek copper-gold project in late 2026.
- The 308% gain in Cufe's share price over the 12 months to October 2026 placed it among the ASX's top-performing materials stocks.
- The campaign targets JORC resource infill and extension at the Orlando and Gecko deposits alongside untested magnetic and gravity anomalies.
- Tennant Creek is globally renowned for exceptionally high-grade ironstone-associated copper-gold pipe deposits with a strong production history.
Few ASX materials stocks delivered a 308% return in the 12 months to October 2026 — Cufe (ASX:CUF) earned it by pivoting from iron ore to Tennant Creek's legendary high-grade copper-gold lodes and then backing the thesis with a 20,100-metre drilling campaign that investors are watching closely.
Strategic Pivot to Tennant Creek
Historically recognised for operating the JWD iron ore mine in Western Australia, Cufe executed a decisive strategic pivot to monetise non-core bulk commodity assets and channel capital into copper and gold. The focal point is now its 55% joint venture interest in the Tennant Creek Copper-Gold Project in the Northern Territory, encompassing high-grade deposits at Orlando and Gecko.
Shares traded at A$0.051 on 2 October 2026 with a market capitalisation of A$105.75 million, supported by a cornerstone investor placement that secured treasury flexibility for the expanded drilling programme.
The 20,100-Metre Drilling Campaign
The primary operational development driving Cufe's market profile is the commencement of an extensive 20,100-metre reverse circulation and diamond drilling programme across the Tennant Creek tenure. The campaign is specifically engineered to infill and extend JORC Mineral Resources at Orlando and Gecko, while testing untested magnetic and gravity anomalies along strike.
Technical studies aim to transition historical mineral estimates into modern JORC-compliant resources to underpin an updated project Scoping Study. Cufe is evaluating both open-pit and underground mining scenarios feeding regional processing hubs.
Tennant Creek's Legendary Deposit Style
The Tennant Creek mineral field is globally renowned for hosting exceptionally high-grade ironstone-associated copper-gold pipe deposits that historically yielded substantial bullion and concentrate output. This deposit style — characterised by narrow, extremely high-grade metallic lodes within ironstones — provides compelling economics when successfully defined and developed.
Commodity Synergies and Infrastructure
In an environment of record Australian Dollar spot gold prices above A$3,800 per ounce and elevated copper demand from global power transmission infrastructure, ironstone-hosted polymetallic deposits offer compelling cash-flow margins. Tennant Creek benefits from established transport links including the Stuart Highway and the Adelaide-to-Darwin railway corridor.
Key Risks
Drilling execution carries risks of assay delays, contractor availability, and structural complexity across narrow high-grade ironstone lodes. Advancing Tennant Creek to commercial production will require substantial capital expenditure, environmental approvals, and mine dewatering. Commodity price fluctuations across copper, gold, and iron ore also remain variables for investor consideration.





_11_12_2026_12_29_36_693411.jpg)
Please wait processing your request...