True North Copper (ASX:TNC) has disclosed encouraging results from an Unmanned Aerial Vehicle Sub-Audio Magnetics (UAV-SAM) geophysical survey at its Mt Oxide Project in northwest Queensland, identifying new prospective copper targets beyond the existing Vero Mineral Resource and Aquila discovery.
Key Points
- UAV-SAM survey covered 8.66 km² and comprised 174.5 line-km at 50 m line spacing across two areas of the Mt Oxide Project
- New targets identified at Ivena North, Rhea, Camp Gossans, Black Marlin and along the Aquila-Apollo trend
- Existing Vero Mineral Resource stands at 15.03Mt at 1.46% Cu, equating to 220,000 tonnes of copper (combined indicated and inferred)
- Drilling is underway at Aquila and Vero-Mara, with assay results expected progressively from December 2026 through Q1 2027
- The survey was partially funded through a Queensland Government Collaborative Exploration Initiative (CEI) grant awarded in March 2026
UAV-SAM Survey Scope and Objectives at Mt Oxide
The UAV-SAM survey was flown by Gap Geophysics over the Mt Oxide Project area during October, covering two separate areas: the Aquila-Chidna trend and its potential extensions to the south, and the Vero-Mara trend, including its southern extensions and the Ivena North and Rhea prospect areas to the north. The survey's primary objectives were to detect near-surface conductive features potentially associated with Cu-Co-Ag mineralisation along the Mt Gordon Fault Zone, map mineralised structures, and improve understanding of the three-dimensional lithological and structural architecture of the Vero and Aquila deposits.
New Exploration Targets Along Mt Oxide Mineralised Corridor
According to the filing, UAV-SAM anomalies correlate closely with copper mineralisation at Vero and Aquila. The results expand new and refined targets at Ivena North, Rhea, Camp Gossans, Black Marlin and along the Aquila-Apollo trend, with the Aquila-Chidna copper corridor having been extended beyond 4 km in recent drilling and surface sampling. The company disclosed that the survey has strengthened its understanding of the geological structures controlling mineralisation and highlighted further opportunities for copper discoveries across the district, expanding the 2026 exploration pipeline.
Drilling Program Schedule and Planned Milestones
The filing outlines a series of scheduled activities across the Mt Oxide Project. Integrated analysis of expanded IP and UAV-SAM surveys is planned for November 2026 to January 2027. Assay results from Phase 2 drilling across Aquila and Vero-Mara are expected to be released progressively from December 2026 to March 2027. A maiden Mineral Resource Estimate at Aquila is targeted for mid-2027, subject to drilling results, geological modelling and resource estimation requirements. Development studies at Vero are planned to commence in H2 2027. Regional exploration targeting and drill program planning is scheduled for Q2 2027.



Please wait processing your request...