Southern Palladium (ASX:SPD) has released its corporate presentation prepared for the 121 Mining Investment London conference, highlighting the Bengwenyama PGM–Chrome Project in South Africa's Bushveld Complex, including details from the company's Updated Preliminary Feasibility Study released on 13 October 2026.

Key Points

  • The Updated PFS, dated 13 October 2026, reported a post-tax project NPV of US$1,961 million at an 8% real discount rate, compared with US$857 million under the July 2025 Original PFS.
  • The Bengwenyama project has a combined Mineral Resource of 40.25 million ounces and a Probable UG2 Ore Reserve of 6.29 million ounces at 31.72Mt at 6.17g/t 6E.
  • The Updated PFS mine plan covers a 33-year forecast mine life with life-of-mine feed of 41.9Mt at 6.54g/t 6E.
  • A Mining Right for the Bengwenyama project was granted in August 2026.

Updated PFS Economics and Mine Plan

The Updated PFS, released on 13 October 2026, reported a post-tax project NPV of US$1,961 million at an 8% real discount rate, a post-tax internal rate of return of 39.1%, and a payback period of 2.8 years from first production. Modelled peak funding was disclosed at US$329 million. The presentation noted the Updated PFS delivered a 129% forecast NPV uplift compared with the July 2025 Original PFS figure of US$857 million, without changing the underlying mine plan. All economic forecasts are presented on a 100% project basis and are subject to PFS assumptions.

Metallurgical Outcomes and Processing Configuration

The Updated PFS incorporated revised metallurgical outcomes, with full-plant chromite recovery increasing to 85.6% from 30% in the previous study, and life-of-mine 6E PGM recovery rising to 87.5% from 85.0%. Life-of-mine chromite concentrate was disclosed at 17.2 million tonnes, compared with 6.0 million tonnes previously. The processing configuration uses Dense Media Separation pre-concentration, a coarser primary grind to preserve chromite recovery, and staged flotation to support PGM recovery, producing high-grade chromite concentrate and high-grade PGM concentrate streams. The proposed configuration remains subject to DFS confirmation.

Revenue Mix and Forecast Cost Position

According to the presentation, chromite is forecast to contribute approximately 18.8% of life-of-mine project revenue under the Updated PFS, with rhodium at 26%, platinum at 25%, palladium at 18%, other PGMs at 11%, and base metals at 1.2%. The Updated PFS forecast an all-in sustaining cost of US$943 per 6E ounce including by-product costs, with combined chrome and base-metal credits of US$446 per ounce, resulting in an AISC after credits of US$497 per ounce. The presentation also disclosed a realised 6E basket price assumption, including by-products, of US$2,210 per ounce in the Updated PFS, compared with US$1,406 per ounce in the previous study.