Saturn Metals (ASX:STN) presented an update on its Apollo Hill Gold Project at its Annual General Meeting on 25 November 2026, disclosing a 2.83 million ounce gold Mineral Resource, a Maiden Ore Reserve of 1.59 million ounces, and progress toward delivery of a Definitive Feasibility Study in calendar year 2026.
Key Points
- Apollo Hill Gold Project holds a 2.83Moz Au Mineral Resource, with 77% in Measured and Indicated categories totalling 2.19Moz Au as of June 2026
- Maiden Ore Reserve of 1.59Moz Au (104.6Mt at 0.47g/t Au) declared in December 2025
- Pre-Feasibility Study delivered a Net Present Value (8%) of A$973M over a 14-year mine life on a 1.77Moz Production Target at A$4,300 gold price
- A$472M capital cost paid back in 2.3 years at the A$4,300 base case, according to the PFS
- Cash position of A$110.7M as of 30 September 2026, with a further A$39.7M anticipated from Tranche Two of a placement announced 29 July 2026, subject to FIRB approval
Apollo Hill Mineral Resource and Ore Reserve
The Apollo Hill Gold Project is located 60 kilometres south-east of Leonora in Western Australia. Saturn Metals disclosed a Mineral Resource of 2.83Moz Au, of which 2.19Moz Au sits in the Measured and Indicated categories. The Maiden Ore Reserve, declared in December 2025, stands at 1.59Moz Au at 104.6 million tonnes grading 0.47 grams per tonne gold at approximately 0.15g/t Au cut-off. Saturn Metals holds 100% ownership of approximately 1,000 square kilometres of gold tenure in the district. The company stated a near-term Reserve upgrade and DFS delivery are targeted for calendar year 2026.
Pre-Feasibility Study Economics and Processing Design
The Pre-Feasibility Study outlined a production target of 1.77Moz based on 117.4 million tonnes at 0.47g/t Au, with an initial processing rate of 10 million tonnes per annum over 11 years, plus ramp-up and ramp-down periods. The PFS recorded a C1 cash cost of A$2,369 per ounce and an All-In Sustaining Cost of A$2,464 per ounce. Total C1 cash costs were A$3,094 million across the life of mine. Life of mine average waste-to-ore strip ratio was disclosed at 2.39 to 1. The PFS pit shell was modelled at A$3,550 (US$2,300) gold price, to a depth of 310 metres.
Heap Leach Metallurgy and DFS Pit Design Progress
Column testwork disclosed gold recovery of more than 78% in fresh rock at 8mm crush and 86% recovery in oxide and transitional columns at 8mm crush. The PFS applied a 73.7% recovery rate and a 160-day stacking schedule. Reagent inputs were disclosed as 3.1kg/t cement agglomeration, 0.3kg/t lime, and 0.3kg/t sodium cyanide. DFS pit design work, with an oblique 3D visualisation published in Saturn's September 2026 quarterly report, has focused on minimising stripping ratio, mine scheduling from pit to crusher to heap, and geotechnical design parameters. The processing plant capital cost was disclosed at A$177 million, with heap leach pad, site preparation and bulk earthworks at A$66 million.