Rincon Resources (ASX:RCR) has reported a high-grade copper-gold intercept of 21 metres at 2.40 g/t gold and 3.83% copper from surface at its 100%-owned Telfer South (Hasties) Gold-Copper Project, located approximately 10 kilometres south of the Telfer Gold-Copper Mine in the Paterson Province of Western Australia, according to a company filing dated 24 November 2026.

Key Points

  • Drill hole HRC26011 returned 21m at 2.40 g/t Au and 3.83% Cu from surface at the Hasties SE deposit
  • Results confirm a new copper-gold zone at the northern end of Hasties SE, interpreted to extend more than 150m along strike and remaining open along strike and at depth
  • 34 RC holes totalling 4,191m have been completed to date; assays for 22 holes (HRC26013 to HRC26034) remain pending
  • Diamond drilling has been planned to determine the orientation of mineralisation, described as oblique to underlying strata

New Copper-Gold Zone at Hasties SE Deposit

Assay results have been received for the first 12 RC holes of the current programme, designated HRC26001 to HRC26012, covering 1,262 metres. These holes were completed within the Hasties Zone, a mineralised corridor extending for 1.1 kilometres that hosts the Hasties Main and Hasties SE deposits. The new copper-gold zone sits at the northern end of the Hasties SE deposit. Mineralisation is interpreted to extend for more than 150 metres along strike and remains open along strike and at depth. Copper assays for HRC26012, and all assays for the 100–150 metre extension of HRC26009, remain pending. All reported intercepts are downhole widths; true widths are not yet known.

Additional Significant Drill Intercepts

Beyond the headline result from HRC26011, multiple additional intercepts were disclosed from the first batch of assay results. Hole HRC26010 returned 8m at 1.12 g/t Au from 12 metres, 3m at 0.26 g/t Au and 0.56% Cu from 19 metres, 4m at 0.48 g/t Au and 0.34% Cu from 28 metres, and 5m at 0.52 g/t Au from 38 metres. Hole HRC26009 returned 4m at 1.45 g/t Au from 64 metres. The RC rig remains on site, with drilling over the next two weeks focused on extending the new copper zone along strike and at depth. Diamond drilling has been planned to determine the orientation of mineralisation.

Programme Scope and Frenchman's Prospect Testing

A total of 34 RC holes for 4,191 metres have been completed to date across the current drilling programme. Assays for the remaining 22 holes, HRC26013 to HRC26034 covering 2,929 metres, are pending and will be reported as received. Following receipt of all assays, the company stated it intends to update the current Mineral Resource estimate. The programme has also tested the Frenchman's Prospect, located on a parallel structure approximately 700 metres north of the Hasties Zone, where historical drilling and surface sampling previously returned significant copper-gold mineralisation. The Telfer South Project is located approximately 10 kilometres south of Greatland Resources Ltd's (ASX: GGP) Telfer Gold-Copper Operations.