Pivotal Metals Limited (ASX:PVT) has released an investor presentation prepared for the 121 London Conference in November 2026, providing an overview of its Horden Lake copper project located in Québec, Canada, including details from a Scoping Study and Mineral Resource estimate.

Key Points

  • Pivotal Metals presented at the 121 London Conference in November 2026, focusing on its Horden Lake copper project in Québec.
  • The Mineral Resource estimate for Horden Lake was announced on 7 July 2026 and has not been updated since that date.
  • A Scoping Study was announced on 29 September 2026, prepared to an AACE International Class 5 estimate with accuracy of -30% to +50%.
  • Approximately 30% of the Net Smelter Return over the life of the Production Target is derived from Inferred Mineral Resources.
  • Material scheduled during the capital-payback period is comprised approximately 86% of Indicated and Inferred Mineral Resources.

Horden Lake Copper Project Overview

The investor presentation filed with the ASX outlines Pivotal Metals' Horden Lake Project in Québec, describing it as a simple, low-cost copper opportunity with significant upside. The company's Mineral Resource estimate for the project was last reported on 7 July 2026, in an announcement titled "Major Copper Resource Growth at Horden Lake." According to the filing, the company confirms it is not aware of any new information or data that materially affects the information included in the original market announcement, and that all material assumptions and technical parameters underpinning the estimates continue to apply and have not materially changed.

Scoping Study Terms and Production Target

The Scoping Study, results of which were announced on 29 September 2026, is described in the filing as a preliminary, order-of-magnitude technical and economic assessment prepared to an AACE International Class 5 estimate, carrying an accuracy range of -30% to +50%. The Study is underpinned by a Production Target based on the project's Mineral Resource estimate. The company states that all material assumptions underpinning the Production Target and forecast financial information derived from it continue to apply and have not materially changed since the 29 September 2026 announcement.

Competent Person and Inferred Resource Disclosures

Exploration results referenced in the presentation were compiled by Mr Paul Nagerl, a Professional Geologist with the Ordre des géologues du Québec and a consultant to Pivotal Metals. Mr Nagerl consents to the inclusion of his findings in the form and context in which they appear. The filing notes there is a lower level of geological confidence associated with Inferred Mineral Resources than with Indicated or Measured Mineral Resources, and that there is no certainty that further exploration work will result in the conversion of Inferred Mineral Resources to Indicated or Measured Mineral Resources, or that the Production Target or forecast financial information derived from it will be realised.