Patriot Resources Limited (ASX:PAT) has disclosed that an internal desktop review of historical exploration data at its Gorman Project in north-western Ontario, Canada, has identified significant gold, silver, lead, and zinc mineralisation from diamond drilling completed by previous operators in 2010 and 2011, including an intersection of 40.7 metres at 1.03 g/t gold and 99 g/t silver from 23.8 metres in hole B-11-02.
Key Points
- Hole B-11-02 intersected 40.7m at 1.03 g/t Au and 99 g/t Ag from 23.8m, with a higher-grade sub-interval of 8.36m at 2.99 g/t Au and 438 g/t Ag from 56.14m
- Hole B-11-01 intersected 14m at 0.73 g/t Au and 291 g/t Ag from 76.8m, including 11.05m at 0.92 g/t Au and 365 g/t Ag
- Historical surface chip samples at Murray-Stewart returned up to 2,720 g/t Ag and 28.6% Pb over 0.4m from veins mapped over 125 metres of strike
- The Gorman Project is currently under strategic review; Patriot's capital and operational focus remains on the Tassa Silver-Gold Project in Peru
Historical Drilling Results at Borland Lake Prospect
The historical drilling program at Borland Lake, conducted between 2010 and 2011, comprised 4,309 metres of diamond drilling and intersected gold, silver, lead, and zinc mineralisation. Hole B-11-02 also returned a sub-interval of 15.5m at 1.63 g/t Au and 285 g/t Ag from 49.0m, and a further interval of 6.0m at 0.51 g/t Au and 93 g/t Ag from 67.7m. The mineralisation is hosted within two parallel, roughly east-west striking silicified shear zones within deformed fine-grained epiclastic greywacke, containing sulphides including pyrrhotite, pyrite, argentite, galena, sphalerite, and arsenopyrite across three discrete lenses.
High-Grade Surface Sampling at Borland Lake and Murray-Stewart
Historical surface sampling conducted in 2006 at the Borland Lake prospect returned nine panel chip samples grading between 21.8 g/t and 710 g/t silver, with gold up to 2.54 g/t. Grab samples returned 640 g/t Ag and 0.45 g/t Au, and 294 g/t Ag, 0.48 g/t Au, and 2.67% zinc. At the Murray-Stewart silver-lead-zinc prospect, chip samples across a shear zone mapped over 125 metres of strike returned 2,720 g/t Ag and 28.6% Pb over 0.4m, 1,600 g/t Ag and 14.8% Pb over 0.15m, and 1,140 g/t Ag and 11.6% Pb over 0.15m. The vein at Murray-Stewart averages 0.2 to 0.25 metres in width.
Gorman Project Strategic Review and Company Focus
According to the filing, the desktop review was undertaken as part of the company's strategy to realise value from the Gorman Project while maintaining focus on the Tassa Silver-Gold Project in Peru. Patriot's field team inspected the historic drill site and core shed at Gorman in 2023; however, gold and silver prospectivity was not assessed at that time due to the company's lithium focus. The Gorman Project covers approximately 13 kilometres of the Bear Head Lake fault zone and hosts four known mineral occurrences. The filing states the Gorman Project is currently under strategic review, with these results to be considered as part of that process.



Please wait processing your request...