Li-FT Power Ltd (ASX:LFT) has released assay results from 11 diamond drill holes completed at its Adina Lithium Project in Québec, Canada, with highlights including an intersection of 45 metres averaging 2.71% Li₂O from hole ALP0007 in the Galinée Zone.

Key Points

  • Hole ALP0007 intersected 45 metres (downhole length) averaging 2.71% Li₂O in the Galinée Zone
  • Hole ALP0014 returned 12 metres averaging 3.14% Li₂O, also in the Galinée Zone
  • The 2026 work program comprised 39 holes totalling 11,420.5 metres; cumulative drill core processed by LIFT is 45 holes and 13,403.5 metres
  • An updated Mineral Resource Estimate and Preliminary Economic Assessment are both targeted for early 2027

2026 Drilling Program Scope at Adina

The results disclosed on 17 November 2026 cover holes ALP0006 through ALP0016, forming part of LIFT's 2026 work program of 39 holes totalling 11,420.5 metres. These follow assay results from the first five holes announced on 26 October 2026. LIFT also completed sampling of six geotechnical holes drilled in 2024, totalling 1,983 metres, that were previously unassayed for lithium. The cumulative 2026 drill core processed by LIFT therefore comprises 45 holes and 13,403.5 metres. Holes ALP0006 and ALP0008 were drilled specifically to collect geotechnical information to support future feasibility studies, not to target spodumene mineralisation.

Notable Intersections from the Galinée Zone

The Galinée Zone was the primary focus of the 2026 program, with drilling designed to establish a level of geological understanding comparable to that of the Adina Main and Footwall zones. Key intersections reported include 45 metres at 2.71% Li₂O from ALP0007, 25 metres at 2.71% Li₂O from ALP0016, and 12 metres at 3.14% Li₂O from ALP0014, all within the Galinée Zone. Additional intersections included 26 metres at 1.86% Li₂O from ALP0010 in the Footwall Zone and 10 metres at 1.56% Li₂O from ALP0013 in the Galinée Zone. All intervals are reported as downhole lengths; true thickness is stated as unknown.

Adina Project Geology and Resource Estimate Timeline

The Adina spodumene pegmatite complex comprises several pegmatite zones within a corridor approximately 350 metres wide, traceable along strike for up to 2.5 kilometres. The complex includes the Adina Main, Footwall, and Galinée zones, forming an east-west trending dyke system with multiple subparallel dykes ranging from less than one metre to 60 metres in thickness and dipping southward at approximately 35 degrees. The Galinée Zone was located on a separate mineral property until May 2026. Results from the 2026 program will contribute to the integration of all three zones into an updated Mineral Resource Estimate and Preliminary Economic Assessment, both targeted for early 2027.