Iondrive Limited (ASX:ION) has released the CEO's presentation delivered at its 2026 Annual General Meeting on 25 November 2026, disclosing that its five-tonne rare earth extraction trial is in commissioning, with one tonne of feedstock on site and four tonnes in transit.

Key Points

  • Five-tonne trial is in commissioning; one tonne of feedstock on site, four tonnes in transit, targeting approximately 1.4 tonnes of mixed rare earth oxide for customer qualification
  • Independent leach tests recorded 96.5% neodymium, 96.5% praseodymium and 93.5% dysprosium recovery with 99.9% iron rejection
  • A pre-FEED screening-level study disclosed a US$243 million post-tax NPV and US$62.1 million EBITDA per year from one modelled module, on US$11.9 million of plant capital
  • Seven prospective feedstock and offtake counterparties are engaged; an Oklahoma site lease is nearing finalisation, conditional on the five-tonne trial and due diligence
  • No supply or offtake has been contracted and no funding has been awarded

Five-Tonne Trial and IONSolv Technology

Iondrive's IONSolv platform is based on deep eutectic solvent chemistry and is designed for selective recovery of critical minerals across multiple feedstocks. The five-tonne trial represents the first integrated test of the estimated overall flowsheet recoveries of 89.3% neodymium, 88.5% praseodymium and 88.8% dysprosium, as previously disclosed on 7 September 2026. The trial tests the flowsheet and is not at commercial scale. Front-end engineering and design (FEED) is stated to follow technical validation, subject to board approval. The leach percentages cited are unaudited single-pass leach efficiencies.

Modelled Economic Study and Module Pathway

According to the filing, the pre-FEED screening-level study — which is not a forecast — modelled one module processing 2,402 tonnes per annum of feed, described as approximately one fifth of a retiring pool of around 13,000 tonnes. The company's stated design intention is to repeat the module as feed is secured, with up to five modules in the medium term against a projected pool of approximately 29,000 tonnes of end-of-life magnets and swarf by 2033, and up to ten modules by 2050 against a pool of approximately 49,000 tonnes. Feed supply, qualification, site and funding are cited as the factors that determine pace.

Commercial Position and Oklahoma Site

The filing states that seven prospective feedstock and offtake counterparties are currently engaged. An Oklahoma site lease is described as nearing finalisation, with completion conditional on the five-tonne trial and due diligence. The company explicitly disclosed that no supply or offtake agreements have been contracted and no funding has been awarded. Next catalysts identified in the presentation are the five-tonne trial result and customer qualification. The presentation was authorised for release by the Board of Iondrive Limited.