Iceni Gold Limited (ASX:ICL) has reported new surface rock chip gold assays of up to 3.26g/t Au from target areas ET2 and ET3 at the Everleigh Farm-In within its 14 Mile Well Gold Project, located between Leonora and Laverton in Western Australia, while disclosing that eight holes for approximately 1,200 metres have been completed in the Stage 1 RC drilling program with assays pending.
Key Points
- Rock chip sampling at ET2 and ET3 returned gold assays including 3.26g/t Au, 2.45g/t Au and 1.84g/t Au, associated with sulphide-bearing quartz veins within the Bellbird Dolerite Sill
- Stage 1 RC drill program has completed 8 holes for approximately 1,200 metres at the Everleigh Farm-In, with assays pending
- Drilling has intersected the highly magnetic dolerite unit, with two completed transects indicating discrete zones of intense quartz-carbonate veining and sulphides
- All exploration and drilling activities are fully funded by Gold Fields under the $10 million Everleigh Farm-In, Option and Joint Venture Agreement, which commenced on 30 June 2026
- First drill samples have been dispatched to the laboratory, with assay results expected progressively from December through to January 2027
Rock Chip Sampling Results at ET2 and ET3
Recent fieldwork and rock chip sampling conducted across target areas ET2 and ET3 at the Everleigh Farm-In returned gold assays including 3.26g/t Au, 2.45g/t Au and 1.84g/t Au. According to the filing, the gold occurrences are spatially associated with a prominent magnetic horizon within the Bellbird Dolerite. The new rock chip results are stated to strengthen the geological targeting model, with anomalism associated with sulphide-bearing quartz veins within the Bellbird Dolerite Sill. Integration of surface geochemistry, geological mapping and aeromagnetic interpretation continues to refine priority drill targets, including prospective extensions of the dolerite beneath cover.
Stage 1 RC Drilling Program Progress at Everleigh
The Stage 1 RC drilling program at the Everleigh Farm-In is currently underway, with eight holes for approximately 1,200 metres completed at the time of the filing. The program is planned for 50 holes totalling approximately 7,000 metres across ten drill traverses. Drilling at ET1, which hosts the Wild West Trend, has successfully intersected the prospective Bellbird Dolerite. Reports from the two completed transects indicate the unit hosts discrete zones of intense quartz-carbonate veining and sulphides. The heritage survey that approved clearing of drill sites on ten drill traverses has been completed, according to the filing.
Gold Fields Farm-In Agreement and Project Background
The Everleigh Farm-In is covered by an option and joint venture agreement with G Ex Australia Pty Ltd, a subsidiary of Gold Fields Limited, under which Gold Fields may spend up to $10 million over five years on a 48 square kilometre package of tenements. The agreement commenced on 30 June 2026. The Everleigh area is located in the central portion of the 14 Mile Well Gold Project and is characterised by a northwest-trending sequence of basalt, dolerite and metasediments, bounded to the east by the Danjo Granite. The farm-in arrangement allows Iceni to focus exploration efforts on other targets, including Goose Well, on 100% held non-JV tenements covering approximately 270 square kilometres.





Please wait processing your request...