GBM Resources Limited (ASX:GBM) has reported assay results from its ongoing Stage 2 drilling program at the Twin Hills Gold Project in Queensland's Drummond Basin, including a 50-metre intersection grading 2.01g/t gold from 246 metres in drill hole LSDH018, located entirely outside the current Lone Sister Mineral Resource Estimate.

Key Points

  • Drill hole LSDH018 returned 50m @ 2.01g/t Au from 246m, entirely outside the current Lone Sister MRE, including 10m @ 4.20g/t Au from 279m and 3m @ 6.99g/t Au from 293m
  • Further Lone Sister results include 16m @ 2.96g/t Au from 430m (LSDH022) and 10m @ 3.04g/t Au from 323m (LSDH014), with the latter including 1m @ 16.95g/t Au from 331m
  • Results at the 309 deposit include 27m @ 1.28g/t Au from 275m (TNDH042), 18m @ 1.53g/t Au from 333m (TNDH065) and 13m @ 1.61g/t Au from 313m (TNDH059)
  • Laboratory backlogs have been cleared and the MRE database quarantined, with the updated Twin Hills MRE on track for completion by end of November 2026

Lone Sister Deposit Drilling Results

Stage 2 drilling at the Lone Sister deposit has returned broad zones of gold mineralisation within and beyond current MRE boundaries. The standout new result is 50m @ 2.01g/t Au from 246m in drill hole LSDH018, with the entire intersection confirmed as outside the current MRE. High-grade sub-intervals include 3m @ 3.41g/t Au from 269m, 10m @ 4.20g/t Au from 279m and 3m @ 6.99g/t Au from 293m. Additional results include 16m @ 2.96g/t Au from 430m in LSDH022, incorporating 6m @ 3.95g/t Au from 433m and 2m @ 7.00g/t Au from 443m. Gold mineralisation at Lone Sister is associated with altered rhyolite and related breccias and structures, according to the filing.

309 Deposit Assay Results

At the 309 deposit, Stage 2 drilling has continued to define gold mineralisation within the Milled Matrix Breccia host sequence and associated structural zones. New results include 18m @ 1.53g/t Au from 333m in TNDH065, with an included interval of 3m @ 5.10g/t Au from 333m, and 13m @ 1.61g/t Au from 313m in TNDH059 with 4m @ 3.42g/t Au from 318m. Additional intersections of 27m @ 1.28g/t Au from 275m in TNDH042 and 3m @ 4.07g/t Au from 241m in TNDH064 were also recorded. The filing states the prospective BXM host sequence has been confirmed by previous drilling to extend at least 700 metres south of the current 309 MRE into the Stella prospect.

Twin Hills Mineral Resource Estimate Timeline

The laboratory backlog affecting Stage 2 drilling results has now been cleared, and the database for the updated Twin Hills MRE has been quarantined. Resource estimation is progressing and remains on track for completion by the end of November 2026, the company disclosed. The Stage 2 program has focused on extending mineralisation beyond existing MRE boundaries, improving geological and grade confidence, and better defining higher-grade mineralised zones at both the Lone Sister and 309 deposits. Testing of high-priority targets within the Lone Sister and 309 mineralised corridor is ongoing, with the aim of pursuing opportunities for new discoveries in proximity to existing deposits.