Everest Metals Corporation (ASX:EMC) has commenced a 6,000m aircore drilling campaign at its Revere Gold Project, located 90km northeast of Meekatharra in Western Australia's Murchison Region, targeting resource expansion and improved geological confidence across a mineralised system hosting a Maiden Mineral Resource of 15Mt at 0.54 g/t Au for 260,780 ounces of contained gold.

Key Points

  • A 6,000m aircore drilling program has commenced at the Revere Gold Project, targeting the Armstrong deposit and the northeast extension of the Big John deposit within the Revere Shear System.
  • Como Engineers Pty Ltd has been appointed to undertake a Scoping Study for Revere, with completion targeted for the March quarter of 2027.
  • Drilling is expected to be completed within three weeks, with assay results anticipated in early November 2026.
  • EMC has agreed to acquire Angelo Levissianos' 5% Joint Venture interest in the Revere Goodins East Project tenements for total consideration of $150,000 cash and 1,000,000 fully paid ordinary EMC shares, increasing EMC's interest from 51% to 56%.
  • The acquisition also reduces the total Gross Revenue royalty burden on Exploration Licences E51/2199 and E51/1770 from 2.0% to 1.0%.

Revere Gold Project Aircore Drilling Program Details

The 6,000m aircore drilling program is focused on the Armstrong deposit and the northeast extension of the Big John deposit within the Revere Shear System. At Armstrong, drilling will comprise approximately 100 holes across 15 drill fence lines spaced 50m apart, with holes spaced at 20m intervals, targeting depths of approximately 60–80m. Armstrong currently hosts an Inferred Mineral Resource of 2Mt at 0.5 g/t Au for 32,307 ounces of contained gold. The program is designed to close drilling gaps through infill drilling, improve geological confidence and continuity within the mineralised shear zone, and test both along-strike and down-dip positions to support future Mineral Resource updates.

Como Engineers Appointed for Revere Scoping Study

EMC has appointed Como Engineers Pty Ltd to undertake a Scoping Study for the Revere Gold Project, with completion targeted for the March quarter of 2027. The Scoping Study will assess potential development pathways based on the existing Mineral Resource and will provide a technical framework for further evaluation of the project. The study is being advanced alongside the company's ongoing permitting and technical work. Como Engineers is described in the filing as an Australian engineering group with experience in mineral processing and project development, including metallurgical testing, scoping and definitive feasibility studies, detailed engineering design, and project construction and commissioning, including modular gold processing plants.

JV Interest and Royalty Rationalisation Transaction Terms

Under the transaction, EMC has agreed to acquire Angelo Levissianos' 5% interest in the Revere Goodins East Project tenements and associated Joint Venture interest for total consideration of $150,000 cash and 1,000,000 fully paid ordinary EMC shares. Following completion, adjusted ownership interests will be EMC 56%, Entelechy Resources Pty Ltd 39%, and Laszlo Szalay 5%. As part of the transaction, existing surface mining and alluvial rights held by both Mr Levissianos and Mr Szalay will be surrendered and extinguished. EMC will also acquire Mr Levissianos' 50% interest in the existing 2.0% Gross Revenue royalty over Exploration Licences E51/2199 and E51/1770, reducing the total royalty burden on those tenements from 2.0% to 1.0%.