Dalrymple Bay Infrastructure Limited (ASX:DBI) has released an investor presentation to accompany a Dalrymple Bay Terminal site visit scheduled for 25 November 2026, disclosing operational details of the terminal including its 84.2 million tonne per annum fully contracted capacity and a $4.02 per tonne Terminal Infrastructure Charge.
Key Points
- DBI released an investor presentation for a Dalrymple Bay Terminal site visit on 25 November 2026
- The terminal's 84.2Mtpa contracted volume is on a 100% take-or-pay basis, with pricing arrangements expiring in 2031
- The Terminal Infrastructure Charge is $4.02 per tonne, levied on every tonne of contracted volume
- DBT currently services 10 customers across 21 mines, with 84% of DBI's revenue derived from predominantly metallurgical coal mines
- DBT holds a 14% share of 2025 global seaborne metallurgical coal exports, ranking as the largest global metallurgical coal export facility by contracted volume
Terminal Capacity and Contracted Volume Details
According to the filing, the Dalrymple Bay Terminal has a current capacity of 84.2 million tonnes per annum, fully contracted on a 100% take-or-pay basis. The Terminal Infrastructure Charge of $4.02 per tonne is levied on every tonne of contracted volume, with terminal operating and maintenance costs passed through 100% to customers. The current pricing arrangement is disclosed as expiring in 2031. Contracts extend to June 2028 with evergreen renewal options for customers, and socialisation applies to any uncontracted capacity. Ten customers utilise DBT across 21 mines as at 30 June 2026.
Terminal History and Location
The filing states DBT was commissioned in 1983 and is located within the Port of Hay Point, approximately 38 kilometres south of Mackay and 900 kilometres north of Brisbane. The terminal has expanded through seven phases, growing from an initial capacity of 14.5 million tonnes per annum in 1983 to its current 84.2 million tonnes per annum. The terminal was privatised in 2001 under a 99-year lease, structured with an initial term of 50 years and a 49-year extension option exercisable at the sole discretion of DBI. DBI was listed on the ASX in December 2020.
Geographic and Rail Network Positioning
The presentation discloses that DBT currently services 21 mines across the Central Bowen Basin. The filing states the estimated centre of the DBT catchment at Coppabella is approximately 144 kilometres from DBT, compared with approximately 305 kilometres to Abbot Point and approximately 536 kilometres to Gladstone. The filing also states that payloads are approximately 20% higher in the Goonyella system compared with the Blackwater system to Gladstone, and approximately 50% higher in the Goonyella system compared with the Goonyella-Abbot Point Expansion route to Abbot Point.



Please wait processing your request...