Critica Limited (ASX:CRI) has presented its Annual General Meeting update to shareholders on 25 November 2026, outlining progress across its two 100%-owned Australian critical minerals projects following the delivery of Scoping Studies for both the Mt Lindsay tungsten and tin project in Tasmania and the Jupiter rare earths project in Western Australia.

Key Points

  • Scoping Studies delivered for both Mt Lindsay (29 September 2026) and Jupiter (20 October 2026) projects
  • Mt Lindsay Scoping Study outlines a proposed 1.0 Mtpa mining rate with a 13.5-year mining schedule and 11.6-year processing life
  • Jupiter is described as Australia's largest clay-hosted rare earth deposit at 1.7 billion tonnes, representing approximately 3% of the broader Brothers District
  • Mt Lindsay Scoping Study reports an after-tax NPV₈ of A$1.0 billion and pre-production capital of A$245 million; Jupiter reports an after-tax NPV₈ of A$2.0 billion and pre-production capital of A$556 million
  • Next steps for Mt Lindsay include environmental studies, metallurgy, mine design and DFS preparation; Jupiter's next steps include customer product qualification, pilot-scale evaluation and PFS preparation

Mt Lindsay Project: Tasmania Underground Concept and Development Pathway

The Mt Lindsay project, located in Tasmania, holds a Mineral Resource encompassing 28,000 tonnes of tungsten and 49,000 tonnes of tin, supported by more than 88,000 metres of completed diamond drilling. The project has 100% ownership and a granted Mining Lease. The Scoping Study conceptual design proposes underground access via a portal within an existing HEC quarry, utilising existing roads, power and disturbed areas. Underground backfill potential for tailings management is under evaluation. The project is situated approximately 120 kilometres from the Port of Burnie by regional rail, and the Tasmanian grid is described as predominantly renewable hydro power.

Jupiter Project: Western Australia Rare Earths Resource and Approvals Status

The Jupiter project, located in Western Australia's Mid-West, is described as Australia's largest clay-hosted rare earth deposit at 1.7 billion tonnes, though this represents approximately 3% of the broader 100%-owned Brothers District. The project has demonstrated MREC at 58% and MREO at 98.2% proven products. Magnet rare earth oxides represent approximately 25.8% of total rare earth oxides. According to an ERM assessment, Native Title has been extinguished across four of five tenements assessed, with the remaining affected area requiring a Right to Negotiate process. Development remains subject to mining tenure, environmental, heritage, Native Title and other statutory approvals.

Priority Workstreams Following 2026 Scoping Studies

Following completion of both Scoping Studies, the company disclosed priority workstreams for each project. For Mt Lindsay, the focus areas are environmental studies and approvals planning, metallurgy and mine design for DFS preparation, and product qualification and funding pathways. For Jupiter, priorities include customer qualification of rare earth products, metallurgy and pilot-scale evaluation alongside PFS preparation, and assessment of gallium and scandium optionality together with strategic partnerships. The company stated that work programmes and development decisions remain subject to funding, technical outcomes and applicable approvals.