Connected Minerals (ASX:CML) has reported the first assay results from its maiden diamond drilling programme at the Bailundo Niobium and Rare Earth Carbonatite Project in Angola, with the first two drill holes each intersecting more than 80 metres of high-grade niobium mineralisation from surface, including zones grading above 3% and 4% Nb₂O₅.

Key Points

  • Drill hole BADD26_001 returned 81.6m at 1.5% Nb₂O₅ from surface to end of hole, including 4.02m at 4.12% Nb₂O₅ from 21.15m
  • Drill hole BADD26_002 returned 83.2m at 1.5% Nb₂O₅ from surface to end of hole, including 1.90m at 4.02% Nb₂O₅ from 18.70m
  • BADD26_001 was drilled as a twin of historical hole SB02, with comparable grades, thicknesses and downhole positions of higher-grade mineralisation confirmed
  • Approximately 63% of planned first-pass drill holes at the Central/Southern niobium target have been completed, with samples from five further holes received by ALS Laboratories for analysis
  • Connected Minerals holds an 80% interest in the Bailundo project, located within the approximately 7km diameter (~39km²) Bailundo Carbonatite Complex in Angola

First Diamond Drill Hole Results at Central/Southern Niobium Target

The Company's maiden drilling programme commenced in September 2026, with initial focus on the Central/Southern niobium target identified through analysis of a historical exploration dataset, surface geochemical sampling and ground geophysical surveys. Drill hole BADD26_001, twinned with historical hole SB02, returned 81.6m at 1.5% Nb₂O₅ from surface to end of hole, including 53.20m at 2.02% Nb₂O₅ from surface, 22.35m at 3.01% Nb₂O₅ from 16.80m, and 4.02m at 4.12% Nb₂O₅ from 21.15m. The higher-grade mineralisation is associated with the weathered carbonatite profile, with mineralisation continuing into the underlying material. The filing states niobium mineralisation remains open at depth.

Second Drill Hole Intersects Niobium at Depth Below Weathered Profile

Drill hole BADD26_002 returned 83.2m at 1.5% Nb₂O₅ from surface to end of hole, including 25.75m at 2.41% Nb₂O₅ from surface, 17.75m at 3.01% Nb₂O₅ from 8.00m, and 1.90m at 4.02% Nb₂O₅ from 18.70m. Significant niobium mineralisation also extended into the underlying variably weathered Fe-carbonatite, with 58.45m at 1.12% Nb₂O₅ from 24.75m recorded in BADD26_002. Both holes intersected higher-grade niobium mineralisation within the weathered carbonatite profile, averaging more than 2% Nb₂O₅, according to the filing. Initial drilling specifically targeted the near-surface weathered profile.

Drilling Programme Grid and Pending Assay Results

The current drilling programme is designed on a nominal 200m × 200m grid, with subsequent infill drilling planned on a nominal 100m × 100m grid, subject to results and operating conditions. The programme includes select twin holes to assess reproducibility of historical results, together with systematic drilling to establish distribution, thickness, grade and geological controls of niobium mineralisation. Historical surface geochemistry identified an extensive niobium anomaly across the Central and Southern portions of the complex, with 118 soil samples returning grades of 0.5% Nb₂O₅ or above, and a peak reported value of 1.43% Nb₂O₅. Results from five additional drill holes received by ALS Laboratories are expected mid-December 2026.