Black Canyon Limited (ASX:BCA) Non-Executive Chairman Graham Ascough has delivered his address to shareholders at the company's 2026 Annual General Meeting, outlining key milestones at the Wandanya project including an initial global Mineral Resource Estimate of 23.6Mt at 25.8% manganese and 12.5Mt at 54.9% iron, announced in September 2026.
Key Points
- Wandanya maiden Mineral Resource Estimate comprises 23.6Mt at 25.8% Mn and 12.5Mt at 54.9% Fe, announced in September 2026
- More than 90% of the MRE is classified in the Measured and Indicated categories
- The manganese system has been defined along 3.4km of strike, described as the base case target
- Metallurgical testwork has consistently delivered product grades close to or over 40% Mn using simple density-based methods
- Global Mineral Resource across the Balfour Manganese Field updated to 315 million tonnes at 10.5% manganese
Wandanya Mineral Resource Estimate Details
According to the filing, the Wandanya Mineral Resource Estimate was announced in September 2026 and covers both manganese and iron mineralisation. The resource carries a high-confidence classification, with more than 90% in the Measured and Indicated categories. The chairman stated this classification will enable an efficient transition to feasibility studies without further detailed resource drilling. The mineralisation is described as shallow, with drilling programs throughout the year delivering consistent, high-grade manganese and iron intersections. The company described Wandanya as one of the most significant recent greenfields manganese discoveries in Australia.
Metallurgical Testwork on Base Case Footprint
The filing states that metallurgical testwork on samples from across the base case footprint demonstrates the potential to produce Direct Shipping Ore iron and manganese products, with low concentrations of deleterious elements. Multiple phases of testwork using low, medium, high and blended feedstock composites consistently delivered product grades close to or over 40% Mn with moderate to high recoveries. The testwork used simple density-based methods. The chairman noted that near-surface, high-confidence resources combined with the metallurgical results substantially reduce project risk and provide processing optionality.
Scoping Study and Balfour Manganese Field Resource Update
The filing states that the Wandanya MRE sets the platform for a Scoping Study, which the company anticipates will be delivered to shareholders by year end. The chairman said the Scoping Study is expected to highlight the potential value of the company's manganese and iron assets to build a long-life mining operation. Additionally, the global Mineral Resource across the Balfour Manganese Field was updated during the year to 315 million tonnes at 10.5% manganese. The company disclosed it has 168.0 million shares on issue as at the date of the filing, 17 November 2026.



Please wait processing your request...