Barton Gold Holdings Limited (ASX:BGD) has released an upgraded JORC (2012) Mineral Resources Estimate for gold at its Tunkillia Gold Project in South Australia, lifting total resources to 1,500koz Au at 59.5Mt grading 0.78 g/t, with 989koz Au classified as Measured and Indicated, including 151koz Au in the Measured category.
Key Points
- Tunkillia total gold MRE is now 1,500koz Au (59.5Mt at 0.78 g/t), with 989koz Au in Measured and Indicated categories and 151koz Au in Measured
- Upgrade followed 57,653m of reverse circulation and diamond drilling across 520 holes completed since September 2025
- Within the May 2025 Optimised Scoping Study pit shells, 81% of all mineralisation (822koz Au) is now classified Measured and Indicated
- Contained gold within all OSS pits is 1,011koz Au at an average grade of 0.83 g/t, representing a variation of only ±2% from the March 2025 MRE figures
- Updated silver MRE is 2,759koz Ag (31.6Mt at 2.71 g/t), with a resampled and upgraded silver MRE expected in Q1 calendar year 2027
Upgraded Tunkillia Gold Mineral Resources Estimate Details
The November 2026 MRE for Tunkillia covers the Area 51, Area 223N, Area 223 and Southern 223 zones. The Measured category totals 5.3Mt at 0.88 g/t for 151koz Au, the Indicated category totals 33.0Mt at 0.79 g/t for 838koz Au, and the Inferred category totals 21.2Mt at 0.75 g/t for 511koz Au. A cut-off grade of 0.3 g/t Au was applied across oxide, transitional and fresh zones. Mineral resources are reported within an optimised pit shell generated by applying a revenue factor of 2.0 to the A$3,500 per ounce optimised pit shell from the May 2025 Optimised Scoping Study, effectively limiting the MRE to mineralisation economically mineable at A$7,000 per ounce gold.
Consistency with May 2025 Optimised Scoping Study Pit Shells
Within the May 2025 OSS pit shells, contained gold is 1,011koz Au at an average grade of 0.83 g/t Au, compared with 1,035koz Au at 0.82 g/t Au in the March 2025 MRE, representing a net change of -2% in contained gold and +1% in average grade. Within the higher-priority S1 and S2 pits, contained gold is 362koz Au at 1.06 g/t Au, compared with 365koz Au at 1.05 g/t Au previously. More than 5Mt of Inferred mineralisation was converted to Indicated, and more than 5Mt of Indicated was converted to Measured within the OSS pit shells. A further 6.2Mt totalling 131koz Au of Indicated Resources sits outside the OSS pit shells.
Tunkillia Pre-Feasibility Study Targeted for Q1 CY2027
According to the filing, the upgraded MRE is intended to serve as the foundation for Tunkillia's Pre-Feasibility Study, which is targeted for completion during Q1 calendar year 2027. The infill drilling programme was designed to upgrade mineralisation within the OSS optimised pit shells in preparation for the PFS. The 6.2Mt of Indicated Resources located outside the May 2025 OSS pit shells is identified in the filing as indicating growth potential for the ongoing PFS. A resampled and upgraded silver MRE is separately expected to be completed in Q1 calendar year 2027.



Please wait processing your request...