Atomic Eagle Limited (ASX:AEU) has disclosed results from follow-up drilling at Muntanga North within its Muntanga Uranium Project in Zambia, defining an extended uranium mineralised zone at Target 5 of approximately 1,500 metres by 200 metres and a new mineralised zone at Target 6 measuring approximately 800 metres by 200 metres.
Key Points
- Target 5 uranium mineralised zone extended to approximately 1,500m by 200m through follow-up drilling
- New mineralised zone defined at Target 6, measuring approximately 800m by 200m and averaging about 3m in thickness
- Significant intercepts include 10.9m at 250ppm eU3O8 from 36.8m (MNDTH2454) and 5.2m at 380ppm eU3O8 from 38.8m (MNDTH2421)
- Total 2026 exploration drilling at Muntanga North and Namakande has reached 216 holes for 21,829m
- Extensional and infill drilling at Chisebuka has been prioritised for the remainder of the 2026 drilling season ahead of an updated Mineral Resource Estimate
Muntanga North Drilling Results at Targets 5 and 6
Since the exploration update dated 16 September 2026, 84 holes totalling 8,367 metres have been completed at Muntanga North Targets 5, 6, 7 and 8. At Target 5, mineralisation is broadly parallel to bedding and has a lenticular geometry. At Target 6, the coherent shallow-dipping zone remains open at its interpreted limits, with the filing noting that further technical assessment is required before determining whether additional drilling is justified. No significant uranium mineralisation was intersected at Targets 1 to 4, 7 and 8, with those results not justifying follow-up drilling at this stage.
Selected Significant Drill Intercepts From Targets 5 and 6
Key intercepts reported from Target 6 include 5.2 metres at 380ppm eU3O8 from 38.8 metres (MNDTH2421), 10.9 metres at 250ppm eU3O8 from 36.8 metres (MNDTH2454), 5.0 metres at 261ppm eU3O8 from 21.9 metres (MNDTH2424), and 4.3 metres at 273ppm eU3O8 from 45.4 metres (MNDTH2453). From Target 5, notable intercepts include 5.7 metres at 184ppm eU3O8 from 93.1 metres (MNDTH2384) and 5.5 metres at 136ppm eU3O8 from 84.9 metres (MNDTH2369). All drill hole information is summarised in appendices to the filing.
Chisebuka Drilling Priorities for Remainder of 2026
The drill program is returning to Chisebuka for extensional and infill drilling for the balance of the 2026 season. Twelve RC holes have been drilled to confirm grades estimated from down-hole gamma logging, with laboratory assays pending. Twenty-five diamond holes are planned to obtain samples for metallurgical testwork and laboratory assays. Additional DTH drilling is planned to infill known mineralisation and support an updated Mineral Resource Estimate in 2027. The program also aims to convert appropriate mineralisation to the Indicated category for use in updated development studies, according to the filing.




Please wait processing your request...